CLEAR SITE
DANDENONGS IN THE DISTANCE
Here are things you need to take care of pre-demolition;
- Asset Protection Permit through your local council e.g. Whitehorse link
- Electricity removal to street level (try to get final reading yourself). If you've recently had your switch board updated with safety switches, it can be removed or sold once power has been disconnected.
- Gas meter removal and supply to street level
- Disconnect water supply to house, but keep water meter & service active for demo and build (i.e. required for asbestos removal)
- Telephone line was a tricky one & we ended up disconnecting the service, but removing the line back to the junction box ourselves
- Storm water and sewerage we left for the demolition team to cap & this saves your sewerage service fee